Ames D.P., Lall U., 2008, Developing Total Maximum Daily Loads under Uncertainty:
Decision Analysis and the Margin of Safety, Journal of Contemporary Water Research
& Education, Vol. 140, pp. 37-52

Busan Metropolitan City, 2009, [Korean Literature], Bu-san-gwang-yeoksi-jaei-dangye-o-yeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Busan Metropolitan City],
pp. 3.1-3.66
Chapra S., 2003, Engineering water quality models and TMDLs, Journal of Water Resources
Planning and Management, Vol. 129, No. 4, pp. 247-256

Chungcheongbuk-do, 2009, [Korean Literature], Chung-cheong-buk-do-jae-i-dan-gyeoyeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Chungcheongbuk-do], pp.
3.1-3.24
Chungcheongnam-do, 2009, [Korean Literature], Chung-cheong-nam-do-jae-i-dan-gyeoyeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Chungcheongnam-do], pp.
3.1-3.75
Crumpacker A.L., Butkus S., 2009, Approaches to Defining TMDL Margin of Safety, Water
Environment Federation, pp. 122-136
Daegu Metropolitan City, 2009, [Korean Literature], Dae-gu-gwang-yeoksi-jaei-dangye-o-yeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Daegu Metropolitan City],
pp. 3.1-3.87
Daejeon Metropolitan City, 2009, [Korean Literature], Dae-jeon-gwang-yeoksi-jaeidan-gye-o-yeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Daejeon Metropolitan City],
pp. 3.1-3.51
DePinto J.V., Freedman P.L., Dilks D.M., Larson W.M., 2004, Models Quantify the Total
Maximum Daily Load Process, Journal of Environmental Engineering, Vol. 130, No. 6,
pp. 703-713

Dilks D.W., Freedman P.L., 2004, Improved Consideration of the Margin of Safety in
Total Maximum Daily Load Development, Journal of Environmental Engineering, Vol. 130,
No. 6, pp. 690-694

Electric Power Research Institute (EPRI), 2004, 2004. 1005473, Approaches for Estimating
the Margin of Safety (MOS) in a Total Maximum Daily Load (TMDL) Calculation: Theoretical
and Practical Considerations, Electric Power Research Institute, pp. 1.1-8.8
Franceschini S., Tsai C., 2008, Incorporating Reliability into the Definition of the
Margin of Safety in Total Maximum Daily Load Calculations, Journal of Water Resources
Planning and Management, Vol. 134, No. 1, pp. 34-44

Gangwon-do, 2009, [Korean Literature], Gang-won-do-jae-i-dan-gyeo-yeom-chong-ryanggwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Gangwon-do], pp. 3.1-3.16
Gwangju Metropolitan City, 2009, [Korean Literature], Gwang-ju-gwang-yeoksi-jaeidan-gye-o-yeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Gwangju Metropolitan City],
Gwangju Metropolitan City, pp. 3.1-3.45
Gyeongsangbuk-do, 2009, [Korean Literature], Gyeong-sang-buk-do-jae-i-dan-gyeoyeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Gyeongsangbuk-do], pp. 3.1-3.433
Gyeongsangnam-do, 2009, [Korean Literature], Gyeong-sang-nam-do-jae-i-dan-gyeoyeom-chong-ryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Gyeongsangnam-do], pp. 3.1-3.469
Han River Basun Environment Office (HRBEO), 2007, [Korean literature], Han-gangsu-gye-su-jil--o-yeom-chong-ryang-gwan-ri-gi-jun-yu-ryang-mit-an-jeon-yul-seol-jeong-yeon-gu.
[A Study on the Establishment of Standard Flow (2nd) and Margin of Safety for Total
Maximum Daily Load in Han River Basin], Han River Basun Environment Office, pp. 1-22
Jeollabuk-do, 2009a, [Korean Literature], Jeol-la-buk-do-jae-i-dan-gyeo-yeom-chongryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Jeollabuk-do], pp. 3.1-3.104
Jeollabuk-do, 2009b, [Korean Literature], Jeol-la-buk-do-jae-i-dan-gyeo-yeom-chongryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Jeollabuk-do], pp. 3.1-3.56
Jeollanam-do, 2009a, [Korean Literature], Jeol-la-nam-do-jae-i-dan-gyeo-yeom-chongryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Jeollanam-do], pp. 3.1-3.68
Jeollanam-do, 2009b, [Korean Literature], Jeol-la-nam-do-jae-i-dan-gyeo-yeom-chongryang-gwan-ri-gi-bon-gye-hoek.
[Total Maximum Daily Load Basic Plan for the 2nd Stage in Jeollanam-do], pp. 3.1-3.90
Langseth D., Brown N., 2011, Risk-Based Margin of safety for Phosphorus TMDLs in Lakes,
Journal of Water Resources Planning and Management, Vol. 137, No. 3, pp. 276-283

Ministry of Environment (MOE), 2004, [Korean literature], Su-jil-o-yeom-chongryang-gwan-ri-eop-mu-pyeon-lam.
[A Handbook of Total Maximum Daily Loads], Ministry of Environment, pp. 1-69
Ministry of Environment (MOE), 2012, [Korean literature], Su-jil-o-yeom-chongryang-gwan-ri-gi-bon-bang-chim.
[Basic Policy for the Total Maximum Daily Loads], Ministry of Environment, pp. 1-29
National Institute of Environmental Research (NIER), 2006a, [Korean literature], Geum-gang-su-gye-jae--i-cha-o-yeom-chong-ryang-gwan-ri-gijun-seol-jeong-yeon-gu.
[A Study on the Standard for the 2nd Stage Total Maximum Daily Load in Geum River
Basin], National Institute of Environmental Research, pp. 1-113
National Institute of Environmental Research (NIER), 2006b, [Korean literature], Nak-dong-gang-su-gye-jae--i-cha-o-yeom-chong-ryang-gwan-ri-gi-jun-seol-jeong-yeon-gu.
[A Study on the Standard for the 2nd Stage Total Maximum Daily Load in Nakdong River
Basin], National Institute of Environmental Research, pp. 1-171
National Institute of Environmental Research (NIER), 2006c, [Korean literature], Yeong-san--gang-Seom-jin-gang-su-gye-jae--i-cha-o-yeom-chong-ryang-gwan-ri-gi-jun-seol-jeong-yeon-gu.
[A Study on the Standard for the 2nd Stage Total Maximum Daily Load in Yeongsan/Seomjin
River Basin], National Institute of Environmental Research, pp. 1-119
National Research Council (NRC), 2001, Assessing the TMDL Approach to Water Quality
Management, Committee to Assess the Scientific Basis of the TMDL Approach to Water
Pollution Reduction, National Research Council, Water Science and Technology Board,
National Academy Press, pp. 1-102
Park J.D., Choi O.Y., Oh S.Y., 2012, Characterization on the Pollution Discharge Load
at the Unit Watershed for the Management of Total Maximum Daily Loads -in Guem River
Basin-, [Korean Literature], Journal of Korean Society on Water Environment, Vol.
28, No. 6, pp. 786-795

Reckhow K.H., 1994, Importance of Scientific Uncertainty in Decision Making, Environmental
Management, Vol. 18, No. 2, pp. 161-166

Reckhow K., 2003, On the need for uncertainty assessment in TMDL modeling and implementation,
Journal of Water Resources Planning and Management, Vol. 129, No. 4, pp. 245-246

Seo D., Lee E., Lee C., Reckhow K., 2009, Estimation of Margin of Safety for Korean
TMDL development, Desalination and Water Treatment, Vol. 2, No. 1-3, pp. 19-23

Stow C.A., Reckhow K.H., Qian S.S., Lamon E.C., Arhonditsis G.B., Borsuk M.E., Seo
D., 2007, Approaches to Evaluate Water Quality Model Parameter Uncertainty for Adaptave
TMDL Implementation, Journal of the American Water Resources Association, Vol. 43,
No. 6, pp. 1499-1507

U.S. Environmental Protection Agency (U.S.EPA), 1991, Guidance for Water Quality-based
decisions: The TMDL Process, EPA 440/4-91-001, U.S. Environmental Protection Agency,
pp. 1-7
U.S. Environmental Protection Agency (U.S.EPA), 1999, Protocol for Developing Nutrient
TMDLs, EPA-841-B-99-007, U.S. Environmental Protection Agency, pp. 2.1-4.14
Walker W.W., 2003, Consideration of Variability and Uncertainty in Phosphorus Total
maximum Daily Loads for Lakes, Journal of Water Resources Planning and Management,
Vol. 129, No. 4, pp. 337-344

Zhang H.X., Yu S.L., 2004, Applying the First Order Error analysis in Determining
the Margin of Safety for Total maximum Daily Load Computations, Journal of Environmental
Engineering, Vol. 130, No. 6, pp. 664-673
